      Production Process of Carbonized wood outdoor chairs

      "Carbonized wood" gluing properties and surface finishing, good performance, and pine in the heat treatment process, turpentine basically volatile resin has cured, therefore, the resin ducts and Setsuko surface, do not do special sealing process can be directly do finishes. Carbonized wood outdoor chairs in use, it will not happen hot weather resin overflow, destroying the paint surface problems.

      Kiln and tank "carbonized wood" outdoor chair production process are divided into primary drying and secondary drying, charring rapid heating, cooling and conditioning treatment, and then cooling the kiln (tank) 5 phase.

      1 Primary Drying

      From birth (wet) wood dried to approximately 12% (or 10%) moisture phase is called once dry. This stage can be in the kiln carbonization (tank) carried, also accomplished by conventional kiln. Given carbonization kiln (tank) of the cost is higher, and the high cost of equipment operation, so using conventional drying kiln for a more economical, and the drying quality is also easier to control, but the drying time.

      (2) second drying

      From 12% dried to a wood moisture content of 3% (or 4%) of the second drying phase is called. This phase carbonization furnace (tank) to complete. Moisture content of about 12% of the timber into the carbonization kiln, the first transition can be conventional drying. Dry bulb temperature from about 65-75 ℃ Start, and then heated in stages to about 125 ℃, wet bulb temperature gradually expanded to 25 ℃. Subject wood moisture content to about 3%, the secondary drying stage ends. This phase of the length of time, depending on the wood species and thickness, 22mm thick timber normally takes more than 10 hours.

      3 rapid heating carbonization

      Wood moisture content of 3% after, they spent the dry dangerous period. Can quickly heat up, in a relatively short period of time, rising carbonization temperature (usually 180 ~ 212 ℃). Carbonization temperature then held constant for about 3 hours, high temperature heat treatment of wood, the wood of the hemicellulose and amorphous cellulose degradation, wood moisture greatly reduce the number of hydroxyl groups. Meanwhile in wood extractives such as resin, terpenoids, tannins, acids, a large number of objects containing volatile. Thus greatly reduced hygroscopicity of wood, dimensional stability and significantly improved corrosion resistance. This stage, the kiln (tank) to be filled within a protective gas (usually water vapor), oxygen gas must be less than 2%, a simple measure of the kiln to maintain the wet-bulb temperature of 99.5 ~ 100 ℃.Otherwise, there will be very dry wood fire hazard, and the wood under high temperature oxidation, its strength is also unfavorable.

      4 cooling humidity

      Wood carbonization treatment, not only the water content is very low (0.5%), and the wood itself, the temperature is high, close to 180 ~ 212 ℃. Then the humidity can not be directly processed must first timber to cool. Note do not use air cooling, if the kiln outside in the fresh air flow into the kiln, it is easy to make wood fire. The correct way is to stop the radiator heating while spraying atomized water to the kiln, not only play a role in cooling, but also make almost all dry timber proper humidification.Subject to the kiln medium temperature dropped about 116 ℃, humidity conditioning treatment can be carried out. Then the kiln while the saturated water vapor injection, and then atomized water spray in order to enhance the relative humidity of the kiln medium moisture content of wood, and to eliminate the residual stress. Wood moisture content generally be increased from 4 to 5%, to end the humidity treatment.


      CONTACT US

      Contact: Mr Chen

      Phone: 13521257486

      Tel: 010-82921102

      Email: zhitong_chenfei@163.com

      Add: Northwest of Beijing haidian district

      主站蜘蛛池模板: 亚洲图片一区| 欧洲成人一区二区三区| 女人被狂躁到高潮视频免费网站 | 男女啊啊啊视频| 亚洲欧美日韩一区二区| 亚洲2021av天堂手机版| 精品视频免费| 国产三级视频网站| 日本黄网站免费| 在线天堂www在线资源下载| 少妇视频在线| 日韩精品国产二区三区| 国产成人福利av综合导航| 午夜三级a三级三点在线观看 | 狠狠88综合久久久久综合网| 亚洲日韩欧美在线观看一区二区三区 | 18无码粉嫩小泬无套在线观看| 中国国产1级毛卡片| 久久福利精品| 九九在线观看视频| 精品久久久久久无码人妻热| 越做高潮越喷奶水视频| 国产人人看| 国产a级免费| 精品国产_亚洲人成在线| 国产精品91在线| 日韩欧美亚| 成在线人免费视频| 日韩精品无码熟人妻视频| 黄色在线免费| 91色视频在线观看| 日产精品久久久久久久蜜臀| 久久天天躁夜夜躁狠狠2018| 中文字幕乱码人妻二区三区| 最新福利视频| 亚洲欧洲av无码专区| 国产剧情福利av一区二区| 男女爱爱动态图| jizz日本在线| 国产98色在线 | 日韩| 制服丝袜自拍另类亚洲|